Phase five carries the set through the field: bids evaluated, submittals reviewed, sites visited, and payment applications verified through closeout.

Phase 05

Where The Set
Meets The Field

Bidding · Submittals · Site · Closeout

Construction Administration begins before ground breaks. Through bidding and award, the firm helps evaluate bidder qualifications, issues addenda and clarifications, and assists the bid evaluations, then sets the preconstruction ground rules for communication, testing, and observation.

Once the field is live, the rhythm is steady: submittals reviewed, site visits made and reported, testing and inspection reports acted on, and monthly payment applications checked against completed work. Comments from the building department and peer reviewers are answered by the engineers who made the design decisions.

Scope Of ServicesPhase 05
Bidding & Award
5.01 Evaluate Bidder Qualifications Assistance weighing who is qualified to build the set.
5.02 Addenda & Clarifications Mechanical, electrical, plumbing, and fire protection addenda and clarifications issued during bidding.
5.03 Bid Evaluations Numbers compared with an engineer’s eye before award.
Preconstruction Services
5.04 Attend Meetings At the table before the first trench is cut.
5.05 Communications Procedures How field questions travel, agreed before they start.
5.06 Testing & Inspection Procedures Procedures established so verification is routine, not improvised.
5.07 Construction Observation Scope Advice on which elements require observation by the design engineers.
5.08 Building Department & Peer Review Comments answered by the engineers who made the decisions.
Submittal Review
5.09 Engineered Item Submittals Submittals reviewed for every item the design engineers drew.
5.10 Related Architectural Submittals Certain architectural submittals reviewed for impact on the four disciplines.
Site Visits
5.11 Site Visits Visits made at intervals appropriate to the stage of construction.
5.12 Site Visit Reports Each visit documented in a written report.
Materials Testing & Inspections
5.13 Review Testing & Inspection Reports Reports read by the people who set the requirements.
5.14 Initiate Action Where the reports call for action, it gets initiated.
5.15 Commissioning Assistance Support for commissioning with a third party agent when required.
Payment Applications
5.16 Payment Application Review Monthly applications reviewed against completed work, with advice on payment.
5.17 Assessment Assistance As requested, help for the construction manager, clerk of works, or architect in assessing completed work.

The team that drew the set stays with it to the end.

Nothing gets lost between designer and field, because they are the same people. From the first addendum to the last payment application, questions land on the desks where the answers were made.

Bids Evaluated Submittals Reviewed Sites Visited Payments Verified
Start The Conversation

Carried Through
To Closeout

Bring the set to the field. We will stay with it until the building runs.

Completed higher education building from the project portfolio After Phase 05 · The Result Project Portfolio The buildings these five phases produce, across five sectors of Central New York and beyond.
Phase05 of 05
FocusBidding · Submittals · Site · Closeout
Sealed By7 Licensed Professional Engineers
Footer | F|S Engineering, DPC