Schematic
Design

Phase two is where the systems take shape: design criteria established, alternatives studied side by side, and the economics modeled before anything is locked in.

Phase 02

Where Systems
Take Shape

Criteria · Alternatives · Economics

With the project set up in phase one, Schematic Design establishes the design criteria for every discipline and puts real alternatives on the table. Our engineers attend the meetings, prepare studies of alternative systems, and help the owner and architect select among them, so direction is chosen on evidence instead of habit.

The economics run alongside the engineering: energy modeling and life cycle cost analysis are updated throughout design to weigh each selection, and geothermal feasibility gets the same continuing treatment. Special studies are identified now, while there is still time to act on what they find.

Scope Of ServicesPhase 02
2.01 Attend Meetings Our engineers are at the table from the first schematic meeting on.
2.02 Establish Design Criteria Mechanical, electrical, plumbing, and fire protection criteria set before systems are chosen.
2.03 Studies of Alternative Systems Options prepared side by side so tradeoffs are visible, not assumed.
2.04 Assist in Selection of Systems The alternatives are weighed with the owner and architect, and direction is chosen together.
2.05 Determine Need for Special Studies Anything unusual gets named early, while there is still time to study it.
2.06 Energy Modeling & Life Cycle Cost Analysis Updated throughout design to aid the economic evaluation of system selections.
2.07 Geothermal Feasibility & Analysis Ground source potential evaluated and kept current as the design develops.

Decisions on evidence, not habit. Alternatives cost little to study and plenty to skip.

The systems chosen here decide what the building pays to run for decades. Modeling the energy and the life cycle cost while options are still open is the least expensive engineering a project will ever buy.

Criteria Established Alternatives Compared Economics Modeled Direction Selected